Home »

New, bigger power system for Vanderhoof by October 2012

Vanderhoof Omineca Express BC Hydro unveiled plans to the district last week for a much bigger substation and new transformer that will double this area’s power capacity. Vanderhoof District’s committee of the whole met with Hydro’s go-to guy last week so they could see plans … Click for more

New Zealand group to study fracking in Fort St. John

Energeticcity.ca The five-day trip, which will begin Friday, Feb.10, will include visits to Vancouver, Victoria, Fort St. John and Calgary, to observe the controversial extraction method of fracking at various well sites. Organizing the trip is Andrew Newman, … Click for more

Northern Gateway pipeline: benefits vs. concerns

CBC.ca The Northern Gateway project is a proposal by Canadian oil and gas company Enbridge to build two pipelines stretching 1177-km between the Alberta oilsands and the West Coast. The Northern Gateway would have the capacity to transport 525000 barrels of … Click for more

Aboriginal leaders stand firm against Northern Gateway pipeline

CBC.ca Stars lend power to fight The public hearings continue in Kitamaat Village Wednesday before moving on to Terrace, BC, Thursday afternoon. MAP Canada’s crude oil pipeline Charting TransCanada’s proposed Keystone XL pipeline Members from Douglas Channel … Click for more

Teuton Geoscience Results

Teuton Resources Corp.(TUO-TSX-V) is pleased to announce the results of a magneto-telluric survey carried out on its Treaty Creek property, located north of Stewart in the Eskay Creek-Sulphurets-Premier region of northwestern British Columbia (the “Golden Triangle”). The survey was conducted last summer by Quantec Geoscience and paid for by Seabridge Gold Inc., owners of the [...]

Drilling Results for Seabbridge KSM Project

Seabridge KSM

Seabridge Gold (TSX:SEA) announcesd that nine exploration holes drilled in 2011 at the Kerr deposit have returned some of the highest grades encountered to date at Seabridge Gold’s 100%-owned KSM project in northwestern British Columbia. All nine of the core holes completed at Kerr (totaling 2,630 meters) intersected mineralization which is expected to add to [...]

Deer Horn Metals Announces Drilling Results

Deer Horn

Deer Horn Metals (TSX.V-DHM) announces that the results of their 2011 drilling program are anow being reported. Deer Horn infill drilling intersects 27.7 m averaging 3.68 g/t Gold (Au), 53.3 g/t Silver (Ag) and 59 ppm Tellurium (Te) with local bonanza grade Gold-Silver intercepts and 4.4 m averaging 24.70 g/t Au, 672 g/t Ag and 745 [...]

Northern BC Natural Resources Forum

Coal loading

  The 9th Annual Northern BC Natural Resources Forum http://www.bcnaturalresourceforum.com/is scheduled for January 11 and 12 in Prince George, BC.  This event is combined with the Business and Technology Show highlighting the business ventures of Northern BC. No longer covering just forestry companies, this event looks at mining, oil & gas, electricity, power and technology [...]

© 2012 northernbcmining.com. All Rights Reserved. Log in

Switch to our mobile site

- Northern BC Mining (www.northernbcmining.com) is a brought to you by Pacific Prairie Consulting